BUILDING
Name Ospedale Gervasutta
CityUdine
UseHospital
Owner
Designer Studio Altieri
ConstructorDI.COS S.p.A.
Year of completion  
Base area 
Total floor area 
Number of storeys 
Construction material R.C.
Target period 
Fixed-base period of the superstructure  
Instrumented / not instrumented  
Tested / not tested  
Soil condition 
Remarks 
ISOLATION SYSTEM  
TypeHDRB
Number of devices 52
Diameter 600, 700, 800 mm
Height210 mm
Design displacement 180 mm
Design shear strain 150%
Design vertical load 2500, 3800, 4300  kN
DesignerStudio Speri
ConstructorFIP Industriale
Remarks